Project Description

In December 2018, the Government of Alberta announced that TransAlta’s Windrise Wind Project was selected as a successful proponent as part of the Alberta Electric System Operator’s (AESO) Renewable Electricity Program (REP) Round 3 process. The 207-megawatt (MW) Windrise Wind Project will contribute to the Government of Alberta’s target of 30 percent renewable electricity by 2030.

In order to connect the Windrise Wind Project to Alberta’s electricity grid, TransAlta is proposing to construct the Windrise Transmission Project (the “Project”). The Project will connect the proposed Windrise Wind Project Substation to the existing Windy Flats 138S Substation through a 138,000 volts (138 kilovolts) transmission line.

 Tower Structure Types

TransAlta has determined that a single pole wood or steel structure will be used for the Project. Engineering design is still ongoing and the structures may be subject to change.

Click here to view the tower structure types.

 

At a Glance

  • Location: MD of Willow Creek, 20km south of Fort Macleod
  • Technology: 138,000 volts
  • Length: 21km

Contact Us

If you have any questions or wish to discuss the Windrise Transmission Project, please contact us:

TransAlta

Email: windrisetransmission@maskwaenv.com

Tel: 844-391-2615

Alberta Electric System Operator (Project need)

Email: stakeholder.relations@aeso.ca

Tel: 888-866-2959

Website: www.aeso.ca

Alberta Utilities Commission (Regulatory process)

Email: consumer-relations@auc.ab.ca

Tel: 780-427-4903

Website: www.auc.ab.ca